Cambridge, Cambridgeshire

Cost-effective EV Charging Solutions

As is the case for many companies, the Directors here were able to cost-effectively adopt Electric Cars via benefit-in-kind (salary sacrifice), in their bid to improve their organisations ESG credentials. The organisation is based within a Grade 1 listed barn, with beautiful surroundings.

This installation required a power upgrade from their local DNO and an attention to detail was required with the installation ensuring it was in-keeping with the picturesque surroundings.

Type of Building

PLC Organisation/Business

Grant Funding Achieved

£1,400

What was installed

4x Active dual post-mounted Zappi chargers (8x sockets)

Additional Functionality

None required, as billing functionality was required.

Safety Features

  • Residual current device (RCD) in place
    to automatically separate the charging station from the electrical power supply in case of a ground fault.

  • Inbuilt RCD in units.

  • Matt:e earthing, PEN fault and surge

    protection.

  • BS7671 complaint.

Previous
Previous

Croydon, London (c/o Workman)