The “Walkie Talkie” Building.

A CBRE Project

Table of Contents

The Challenge

CBRE were looking to introduce an EV charging strategy to cater for the needs of the post-covid workplace. They needed a charging solution that enhanced their end of trip facilities and catered for emobility users. The facilities on site are locked down to occupants only. With limited parking spaces and maximum occupancy levels of around 6,000, CBRE needed a dynamic charging solution with software that supports the EV charging needs of their tenants.

Outcome

Electric Spinach installed 7KW EVBox chargers to a dedicated charging area in the ‘Walkie Talkie’s’ end of trip facility annex. They chose Fuuse for easy management and ongoing maintenance of the chargers, and functionality to maximise charger availability, generate revenue and deliver a smooth charging experience.


Easy Management & Maintainence


Accessible and User-Friendly


Fast Charging

Ready to take control of your EV infrastructure?

Every environment has different operational priorities, but they all require the same thing—safe, reliable and professionally managed EV infrastructure that continues to perform long after installation.

More projects