The Electric Spinach Perspective

Successful commercial EV infrastructure begins with planning, not procurement. The decisions made before installation determine how reliable, scalable and cost-effective the system will be throughout its operational life.

Quick Answer

Before installing commercial EV chargers, organisations should define their objectives, understand user requirements, assess available electrical capacity, choose suitable locations, select appropriate hardware and software, and plan for future maintenance and expansion.

1. Define the purpose

Decide whether the infrastructure is for staff, residents, visitors, fleet vehicles or public use. This affects charger specification, access control and billing.

2. Understand your electrical infrastructure

Carry out an electrical assessment early to understand available capacity, potential load management requirements and whether a DNO upgrade may be necessary.

3. Plan the physical installation

Consider accessibility, parking layout, lighting, cable routes, vehicle impact protection, drainage and opportunities for future expansion.

4. Choose hardware and software together

Treat chargers and backend software as one operational system. Consider interoperability, OCPP compatibility, reporting and remote management.

5. Plan beyond installation

Budget for annual inspections, preventative maintenance, software support and long-term lifecycle management from the outset.

Evidence & Guidance

Relevant legislation, standards and guidance include:

Get Help

Electric Spinach provides independent advice on planning, specification and long-term management of commercial EV infrastructure.